|
|
|
Poplar for the drawers.
|
|
|
|
crosscut to width...
|
|
|
|
thicknessed...
|
|
|
|
set out...
|
|
|
|
|
dovetailed on the Littlerat....
|
|
|
|
dados cut fot the bottoms...
|
|
|
|
shellac the inside faces before assembly...
|
|
|
|
all ready for glue up.....
|
|
|
|
|
clamp 'em up!
|
|
|
|
Completed drawer
|
|
|
|
Screw the runners to the side and slide 'em in-job done!
|
|
|
|
Table glued up and in the clamps.
|
|
|
|
|
Applying oil finish to the zebrano drawer fronts and backs.
|
|
|
|
Applying first coat of oil/varnish.
|
|
|
|
6 coats applies and lightly rubbed out.
|
|
|
|
Looks good-water and heat proof, too!
|
|
|
|
|
Drawer fronts applied.
|
|
|
|
I overlapped the bottom edges of the fronts as drawer pulls.
|
|
|
|
In situ-another satisfied customer.
|
|
|
|
Figure of top-lots of swirling colours and the odd birds-eye.
|
|
|